Installation
**Click images to view larger in new window**
G3 equipped with Cumberland Crappie Rod Holders
Skeeter on Jordan
Cumberland Crappie LLC
Custom Rod Holders
G3 Spider Rig
skeeter1
skeeter2
Pontoon set up for spider rigging
pontoon
Pontoon set up
stratos 285
Step 1: Mount base in desired location. Drill 3 x 1/4inch holes for bolts. Tighten nuts and bolts.
If access is not available to use bolts just let us know and we will include stainless steel screws.
mounting base
base
Step 2: Thread rod into base and snug up the
locking nut at the bottom.
aluminum rod
Step 3: Slide 1" aluminum sleeve over the rod.
aluminum sleeve over rod
Step 4: Slide horizontal bar with rod holders on
to rod and locking into the sleeve.
rod holders
Step 5: Screw black knob on and tighten.
set up complete!
**Once bases are mounted each rod holder can be easily mounted or removed in less than 1 minute**.
Cumberland Crappie Rod Holders are compatible with 1/2" threaded bases made by other manufacturers.
Crappie Boat Photos below
Copyright © 2010 Cumberland Crappie LLC. All rights reserved.